Compute cost planner·Rent vs buy

Rent or buy

Pick a GPU class, a node count and a horizon. The planner prices it at every known neocloud, builds the owned-hardware case with hosting and depreciation, and runs the buy gate from the Compute Management Policy.

Periods

One row per line of compute. Rows can overlap: a rendering node runs alongside the training nodes. Start is the month the row begins; a new row starts when the previous one ends. In Compare, mark rows Rent or Own to build a mixed plan.

NameGPUNodesStartMonthsUtil %SourcingVendor$/GPU-h

Sourcing

Policy default is rent. Buy only when every line of the gate passes in writing, with CEO approval.

Presets from the plan

Scenario

override
% if no quote
Owned hardware assumptions
GPUUSD / nodekW / node
8-GPU HGX server estimates, editable
$/node, once
InfiniBand switches, transceivers, cables; about $200k per 64-GPU NDR fabric. Set 0 for single-node Ethernet.
$ fixed
Racks, PDUs, management and login nodes, OOB switch, install, shipping
$/node
%
$/kW-month
$/node-month
% of capex / yr
$/month
$ fixed
Colo contract and onboarding, racking, cabling, burn-in, firmware, OS images, scheduler install: 2 to 4 engineer-weeks
$/month
About 0.4 FTE fully loaded: patching, DCGM, failures and RMAs, on-call, spares. Policy requires a named ops owner. This engineer is not building the data pipeline.
$/month
Colo smart-hands at $150 to $250 an hour plus freight for returned parts
% / yr on capex
Simple interest on the full capex while owned; 0 to compare on cash alone
% of hours
GPU and HBM failures, RMA turnaround, firmware and maintenance windows. Lost hours are backfilled from on-demand rent.
months
% of capex / yr
Extended support or self-insured spares once the OEM warranty lapses
% / yr
months
Level payments; interest replaces the cost-of-capital line. Payments still owed at the horizon count against the net.
months
% at end of life
% of peak
months rented
Storage, both cases
TB
$/TB-month
TB
$/TB-month
Save, share, reset
Settings stay in this browser. Copy the JSON to share a scenario or paste one to load it.

Buy gate

Policy section 5.1. All lines must pass, in writing, with CEO approval. Owned nodes are depreciated over 3 years and hosting is charged to the same envelopes.

Cumulative cost over the horizon

Rent, cumulative Own, cash out (capex up front) Own, depreciated (P&L view)

Where the money goes

Per row, then run rates. Effective cost divides what is paid by what is used, the policy's unit metric.

PeriodGPUNodesStartMonthsUtilGPU-h usedRentOwn: burst rentPlanPlan cost

Rent

Own

Known neoclouds for this scenario

Vendor list from "Romoya Compute Planning - Vendors"; list prices re-checked on each vendor site on Oct 7, 2026. Click a row to price the scenario there. Edit a price to override it; overrides persist in this browser.

Vendor Region Fabric Status · commitment terms Other GPUs, $/GPU-h $/GPU-h on-demand $/GPU-h reserved Node-month Horizon